Overview

Address 184-188, 190, 192, 196/1,  NSK Salai,

Arcot Road, Vadapalani,  Chennai – 600 026

Location Vadapalani
Type of property Residential
No. of Flats 384
No of Blocks 5
Type of Flats 1BHK, 1.5 BHK, 2BHK, 2.5 BHK,  3BHK & 4BHK
No. of Floors Basement + 18 Floors (Blocks 1 & 2) : Trellis South

Lobby + 4 Floors         (Blocks 3,4 & 5): Trellis North

1-Bedroom : 36

1.5-Bedroom : 4

2 –Bedroom :  60

2.5-Bedroom : 20

3-Bedroom :   232

4 -Bedroom : 32

Apartment Range 1 BHKs : 515 – 523 Sq ft

1.5 BHKs : 611 Sq ft

2 BHKs : 663 Sq ft   – 1080 Sq ft.

2.5 BHKs : 1345 Sq ft –   1487 Sq ft

3 BHKs : 1495 – 1925 Sq ft

4 BHKs : 2350 Sq ft

 

Car Park

For Blocks 1 & 2 :

Basement, Lobby, First Floor & Second Floor

For Blocks 3, 4 & 5 : Stilt

FAQ

TRELLIS  – FAQ
We have attempted to provide answers to the queries in the sequence of order normally asked by the customers.  However, if you have any other queries, please visit our office.
 

1)

 Where is Trellis located?

Trellis is located right on the Arcot Road, Vadapalani and next to the Vadapalani Metro Station.  The site has unbelievably close proximity to all reputed healthcare facilities, academic institutions, Koyambedu Mofussil Bus Terminus and much more. The salient feature is that Forum Vijaya Mall and Satyam Cinemas are next door.

2) Can you share with us some of the details about Trellis?

Trellis will come up on an expansive spread of 5.08 acres (2,21,567 sq ft) – A land area of 21,789 sq.ft.  is earmarked for open space reservation and 3,944 sq ft. for road widening. The total built-up area will be 1,95,834 sq.ft.

This development will have 384 apartments in five blocks with configurations of             1 BHKs, 1.5 BHKs, 2 BHKs, 2.5 BHKs, 3 BHKs & 4 BHKs.

The areas start from 515 sq.ft. to 2350 sq.ft. with classy amenities.

Space efficient 1 BHKs, 1.5 BHKs & 2 BHKs is a special feature of Trellis.

3) What is the Approval status?

Planning Permit (from CMDA) & Building Permit (from Corporation) obtained.

4) What about Environmental Clearance?

Trellis has received the  Environmental clearance from the Government of India.

5) What is the current status?

For latest updates, visit our website:- www.appaswamy.com

6) What is the payment schedule?

For Blocks 1 & 2 (Trellis – South)

  • At the time of  Booking : Rs.5.0 lakhs
  • Within 30 days from the date of Booking :  20%
  • Basement Roof completion : 10%
  • Third  Floor roof completion : 10%
  • Sixth  Floor roof completion : 7%
  • Nineth  Floor roof completion :  7%
  • Twelfth Floor roof completion  : 7%
  • Fifteen Floor roof completion :  7%
  • Eighteenth Floor roof completion : 7%
  • Brickwork and Plastering completion of respective floors :  10%
  • Tiling/Electrical completion of respective floors :  10%
  • 21 days before possession :  5%

For Blocks 3, 4 & 5 (Trellis – North)

  • At the time of  Booking : Rs.5.0 lakhs
  • Within 30 days from the date of Booking :  20%
  • Stilt Floor Roof completion :  10%
  • First  Floor roof completion : 10%
  • Second  Floor roof completion : 10%
  • Third  Floor roof completion  : 10%
  • Fourth Floor roof completion  : 10%
  • Brickwork and Plastering completion of respective floors :  10%
  • Tiling/Electrical completion of respective floors  : 15%
  • 21 days before possession :  5%
7) What do you mean by Customization?

Customization in absolute sense means modification according to a customer’s individual requirements.  While the project is designed according to a set of specifications and parameters, it is therefore difficult to envisage or accommodate all needs or everything associated with the general expectations of customers.

Customization in general covers lofts, extra switch points, grills in balcony & for main entrance and is strictly guided by feasibility.  These requests can be accommodated, depending upon the feasibility and  will entail additional costs, on the basis of cost estimates agreed and payment made in advance.

The customization requirements will be facilitated by our Customer Care Team.

8) When can I approach your Customer Care team to make changes within the apartment?

The request for changes/ customization will be considered either at the time of signing the construction agreement or when the 30% payment stage is completed or at the beginning of the particular activity, whichever is appropriate.

Customer Care team will send an invite for customization with soft copies of electrical and civil drawings by mail outlining the feasibility of each customization including the ‘not-so-feasible’ works like bathrooms / waterlines, in particular, which cannot be changed or altered.

9) What type of kitchen is provided?

The kitchen will have a granite platform with SS sink.

10) Will Lofts be provided?

Apart from loft in kitchen, 1 & 2 BHKs will have one loft in bedroom  while  3 & 4 BHKs will have two lofts in two bedrooms.

Our offering does not include the wardrobes and anyone intending to have wardrobes may approach a specialist for the same.

11) What are the other costs?

Covered car park, registration charges, service tax, corpus fund, maintenance, statutory deposits, DTH Multi-system, Reticulated Gas, etc.

12) Which Banks have approved this project?

HDFC, ICICI, SBI, LIC and Sundaram Finance have approved this project.

13) How is water quality?

“Water Treatment Plant” is provided as a value addition.

Water treatment aids in the removal of calcium, magnesium, and certain other metals  in hard water. The resulting soft water is more compatible with soap and extends the lifetime of plumbing.

14) Is there any provision for Back-up power?

Yes.  Elevators / motor pumps and common areas will have 100% back-up while each apartment to have 1,000 watts back-up.

15) I am an NRI. Can I book from abroad?

Yes.  You can book from anywhere in the world.  Just send your complete details by email.

16) How can I transfer funds to your account?

You can wire-transfer funds from anywhere in India or from abroad using RTGS mode. Just send a mail to us at arel@vsnl.net to get our account number / bank / branch and Swift codes.

Elevation

Will be updated soon.

Location Map

34

Site Plan

01

Features

  • Clubhouse
    • Fitness Centre
    • Indoors Games
    • Guest Rooms
    • Mini Theatre
    • Party Hall
    • Swimming pool
  • Individual water meter for each unit
  • Water treatment plant
  • Children  play area / Walking Track
  • Video security phone and intercom
  • Access controlled doors with CCTV cameras coverage @ vantage points
  • Access controlled barrier for car park entry
  • 1000 watts  power back up for each unit/ 500 watts for Blocks 3 & 5
  • 100 % power back-up power for common areas, lifts and pumps
  • Rain water harvesting
  • Reticulated gas
  • Fire Alarm & Wet Riser system
  • Sewage treatment plant
  • Toilets for drivers & domestic helps in all Blocks
  • Landscaped  garden
  • Security cabins
  • Lifts with V3F & ARD
  • Comprehensive waste management system

*indicative in nature and subject to change without prior notification.

Specifications

FLOORING
Living + Dining + Bedrooms + Kitchen Hi-end Vitrified Tiles
Balconies + Bathrooms Anti-skid Tiles
Bathroom Wall Tiles Up to false-ceiling height
Main Entrance Lobbies & Upper Lobbies Vitrified / Granite / Natural  Stone
 DOORS/WINDOWS
Main Door Classy Main Door
Internal Doors Flush doors
Windows UPVC
 SANITARY FIXTURES & FITTINGS
Branded sanitaryware
Wall mounted closet
Parryware/Johnson or equivalent
Shower Partition in Master Bed Bathroom
Ledge in all bathrooms
 WALL FINISH
Exterior Weather-proof Emulsion
Interior Quality Emulsion
 KITCHEN
Granite Platform with S.S.Sink
 LOCKS
Dorma or equivalent pin lock for main door.
ELECTRICALS
3-phase electricity with individual electronic meters
2-way switch for light and fan in Master bedroom
Hi-end  switches
Siemens/equivalent ELCB in all units
*Indicative in nature and subject to change without  prior notice

Floor Plans

0203040506070809 1011121314151617181920212223242526272829

30313233

Current Status

Trellis South : Block 1

 

Trellis South : Block 1 : Columns being raised

 

 

 

Trellis South : Block 2

 

Trellis South : Another view of Block 2

 

Trellis North : Block 3

 

Trellis North :  Block 4

Trellis North :  Block 4 (Another view)

 

Trellis North : Block 5

 

Trellis South

Block 1 – Third floor roof completed.  Fourth floor roof work in progress

Block 2 – Third floor roof completed

 

Trellis North

Block 3 & 4  – Brick work & plastering, window and balcony grills completed.

Block 5 – Brick work and plastering  fully completed. Window grill installation underway. Balcony grill installation nearing completion. Terrace water proofing in progress.

 

 

Availability

  1. Corporate Office –

email: arel@vsnl.net

Phone : +91 44 2434 6333 / 2434 9090

Mobile: +91 99620 19149

Fax : +91 44 2434 3627

Enquiry

Trellis Project Enquiry

Walkthrough

Downloads

Livechat Conversation