Overview

Address M.R Radha Garden Road,

Pudupakkam,Chennai.

Location Pudupakkam (Behind Siruseri IT Park)
Type of property Residential
No. of Blocks 4
Type of Flats 2 BHK & 3 BHK
No. of Floors  Stilt + 9 Floors
No of Flats 212

2 Bedroom + 2 Toilets : 80 Units

3 Bedroom + 2 Toilets : 64 Units

3 Bedroom + 3 Toilets : 68 Units

Apartment Range 2 BHKs + 2 Toilets : 1244, 1425 & 1482  Sq ft.

3 BHKs  + 2 Toilets: 1487, 1547, 1584, 1591 & 1640 Sq ft

3 BHKs + 3 Toilets :  1737 Sq ft

Car Parking Stilt
Expected Delivery September 2017

FAQ

HABIT@T  – FAQ
We have attempted to provide answers to the queries in the sequence of order normally asked by the customers.  However, if you have any other queries, please visit our office.
 

1)

Where is Habit@t located?

It is located right behind the Siruseri SIPCOT IT Park.

2) Can you share some of the details about Habit@t?

Habit@t is set amidst 40 Grounds – A land area of 10,750 sq ft has been earmarked for open space reservation.

This development will have 212 apartments in four blocks consisting of 2 BHKs & 3 BHKs.

The areas start from 1244 sq.ft. to 1737 sq ft.

3) What is the Approval status?

All approvals obtained.

4) What is the current status?

For latest updates, visit our website.

5) What is the payment schedule?

  • At the time of  booking : 10 % of the overall flat cost
  • Within one month :  30 %
  • On Completion :  60 %
6) What do you mean by Customization?

Customization in general covers lofts, extra switch points, grills in balcony & for main entrance and is strictly guided by feasibility.  These requests can be accommodated, depending upon the feasibility and entail additional costs, on the basis of cost estimates agreed and payment made in advance.

The customization requirements will be facilitated by our Customer Care Team.

7) When can I approach your Customer Care team to make changes within the apartment?

The request for changes/ customization will be considered either at the time of signing the construction agreement or when the 30% payment stage is completed or at the beginning of the particular activity, whichever is appropriate.

Customer Care team will send an invite for customization with soft copies of electrical and civil drawings by mail outlining the feasibility of each customization including the ‘not-so-feasible’ works like bathrooms / waterlines, in particular, which cannot be changed or altered.

8) What type of kitchen is provided?

Kitchen will have granite top with stainless steel sink.

9) Will Lofts be provided?

Bedrooms will have lofts.

Our offering does not include the wardrobes and anyone intending to have wardrobes may approach a specialist for the same.

10) What are the other costs?

Car park, registration charges, service tax, corpus fund, maintenance, statutory deposits, DTH Multi-system, Reticulated Gas deposit, etc.,

11) Which Banks have approved this project?

All leading banks have approved this project.

12) How is water quality?

“Water Softening Plant” is provided as part of our offering.

Water softening aids in the removal of calcium, magnesium, and certain other metals  in hard water. The resulting soft water is more compatible with soap and extends the lifetime of plumbing.

13) Is there any provision for Back-up power?

Yes. Elevators / motor pumps, common areas will have 100% back-up while each apartment will have 500 watts back-up.

14) I am an NRI. Can I book from abroad?

Yes.  You can book from anywhere in the world.  Just send your complete details by email.

15) How can I transfer funds to your account?

You can wire-transfer funds from anywhere in India or from abroad using RTGS mode. Just send a mail to us at arel@vsnl.net to get our account number / bank / branch and Swift codes.

Elevation

Elevation

Location Map

habitat-location

Site Plan

01

Features

  • Clubhouse
    • Fitness Centre (A/c)
    • Indoor  Games (A/c)
    • Party Hall (A/c)
    • Swimming Pool
  • Reticulated Gas
  • Water softening plant
  • Lifts with ARD & V-3F
  • Fire alarm / Wet Riser System
  • Security Cabins
  • Rainwater Harvesting
  • 500 Watts standby power supply for each apartment
  • 100% back–up power for common areas, lifts and pumps
  • Sewage Treatment Plant
  • Toilets for Drivers/ domestic  help
  • Landscaped garden
  • Water meter for all apartments
  • Video door phone
  • Wi-fi connectivity in Clubhouse
  • Provision for AC Outdoor unit placement
  • Core cutting / AC water drainage

*Indicative in nature and subject to change.

Specifications

FLOORING
Living + Dining Bedrooms + Kitchen Superior quality Vitrified Tiles
Balconies + Bathrooms Anti-skid tiles

Bathroom wall tiles up to false-ceiling height

Main entrance lobbies & Upper lobbies Vitrified / Granite  / Natural Stone
DOORS
Main Door Hardcore flush door with teak wood frame
Other doors Hardcore flush doors
Bathroom Doors Anti-rotting doors

Granite ledge top in bathroom

Locks Godrej / equivalent pin lock in main door
FURNISHING
Windows UPVC
Kitchen Granite platform with SS sink
Lofts Bedrooms
Sanitary fixtures & fittings Hindware or equivalent
Wall finishes Internal walls :  Quality Emulsion

External Walls :    Weather-proof emulsion

Wall Tiles Up to false-ceiling height in Bathrooms
Electricals 3-phase electricity with individual electronic meters

MK or equivalent switches

2-way switches for light & fan in all bedrooms.

Siemens/equivalent ELCB in all units

Washing machine provision

Floor Plans

020304050613121110090807141516171820

Current Status

 

Compound wall completed (Facing the Road)

 

Exit gate view ( Block 3)

 

Main entrance view (Block 2)

HABITAT SITE STATUS : APRIL 2017

 

Block -1

UPVC window installation & grill work completed

Lobby, staircase work up to 2nd floor completed

Kitchen granite work completed

Electrical work, door fixing and wall putty completed up to 2nd   floor. Work in progress from 3rd floor onwards

Tiling work in progress

Lift installation work completed. Trail to complete

Plumbing, shaft and internal work completed

Sewage pipeline work in progress

Fire fighting sprinkler work  in progress

Electrical panel work erection completed, tray & earth fixed. Cabling work is in progress.

Rain water harvesting work underway

 

Block – 2

UPVC window installation & grill work completed

Lobby & staircase work to commence

Kitchen granite work completed

Tiling to start

Electrical work, door fixing and wall putty work to start

Lift installation work completed. Trial to complete.

Plumbing shaft and internal up to 8th floor completed. 9th floor work in progress

Electrical panel work erection completed. Cabling work in progress

Rain water harvesting work underway

 

Block – C

Internal & external plastering completed

UPVC window installation & grill work underway

Lobby, staircase & kitchen granite work to start

Tiling to start

Electrical work, door fixing and wall putty to start

Lift installation work completed. Trial to complete soon

Plumbing Internal completed up to 5th floor. Work underway from 6th floor onwards

Plumbing shaft area work in progress

Electrical panel work erection completed. Tray, earth & cabling work in progress

Rain water harvesting work underway

 

Block – 4

Internal & external plastering completed

UPVC window installation & grill work underway

Lobby, staircase & kitchen granite work to start

Tiling to commence

Electrical work, door fixing and wall putty work to start

Lift installation completed.  Trial to complete soon

Internal plumbing completed up to 5th   floor.  Work underway from 6th floor

Plumbing shaft work to start

Electrical panel work erection completed. Tray, earth & cabling work in progress

Rain water harvesting to complete soon

COMMON AREA STATUS

Security room enclosure nearing completion

Compound wall completed

Paver block work to start

Sewage treatment plant work to begin

Availability

Corporate Office –

eMail: arel@vsnl.net

Phone : +91 44 2434 6333 / 2434 9090

Mobile: +91 7401701909

Fax : +91 44 2434 3627

www.appaswamy.com

Enquiry

Habitat Project Enquiry

Walkthrough

Downloads

Livechat Conversation